Send a request

Electrical equipment: transformers, switchgear, cable, lighting

We supply electrical equipment for substations, industrial facilities and construction. We check parameters against the design, review test reports and arrange certificates in advance.

Send a requestCalculate shipping and customs clearance

What we supply

Transformers

Oil-immersed and dry-type power transformers, packaged transformer substations, current and voltage transformers.

Switchgear

Switchgear 0.4–35 kV, vacuum and SF6 circuit breakers, disconnectors, switchgear panels.

Low-voltage equipment

Circuit breakers, contactors, relays, distribution boards, RCDs — Chint, Delixi and others.

Cable and wire

Copper and aluminium power cable, self-supporting insulated wire, control and installation wire.

Lighting

Industrial and street LED luminaires, floodlights, poles, lighting control systems.

Materials for manufacturing

Electrical steel, winding wire, insulation, bushings — for transformer and switchboard manufacturers.

How we check this particular product

Parameters per design
We check ratings, vector groups, voltage class and enclosure type against your design documentation.
Test reports
We request the factory routine test reports and review them before shipment.
Conductor cross-section and material
For cable we spot-check the actual cross-section, conductor material and insulation — a common problem on the market.
Scope of supply
We check the scope of supply: bushings, protection, metering devices, documentation.
Packaging
Transformers and switchgear are secured and packed for long-distance transport, with the centre of gravity marked.

What to send for an accurate quote

  • Specification or an extract from the design
  • Voltage, power, rated currents
  • Indoor or outdoor version, climate
  • Quantity and lead times
  • Customer requirements for brands or certificates
  • Delivery city

Shipping: what to keep in mind

Heavy packages

Transformers require a crane for unloading and securing according to the factory’s diagram.

Cable on drums

Cable travels on wooden drums — we take the weight and dimensions into account when choosing transport.

Groupage shipments

Switchgear components and lighting are cost-effective to ship as groupage cargo together with other items.

Documents and certificates

EAEU

Low-voltage equipment — TR CU 004/2011 and 020/2011. We check requirements for high-voltage equipment by HS code and intended use.

Uzbekistan

O‘zstandart certificate of conformity for most electrical products.

For tenders

If the equipment is for a public tender, we check the document and country-of-origin requirements in advance.

Requirements depend on the exact HS code. We check them before purchase and include the cost of certification in the quote.

Questions about this category

Can I order a transformer to our specifications?

Yes. Factories manufacture to a questionnaire: power, voltages, vector group, design version.

How can I be sure the cable matches the stated cross-section?

We measure and weigh samples before shipment and compare them with the declared characteristics.

Do you work on tenders?

Yes. We help prepare a commercial offer and equipment documents to meet the tender requirements.

How long does it take to manufacture a transformer?

Usually 30–60 days, depending on the power rating and the factory’s workload.

Is there a warranty?

The factory warranty is set out in the contract; we handle warranty claims together with you.

Send us a request and we will calculate it for your case

We reply within an hour during business hours. An offer with factory prices usually takes 3–5 business days.

By clicking “Send” you agree to the processing of your data to answer the request. We do not share it with third parties.