Pumps, pipes, valves and water treatment equipment
We select pumps by duty point, not by catalogue: flow, head, medium, operating mode. Our team designs water treatment systems itself, so we check the equipment as engineers.
What we supply
Pumps
End-suction, multistage, submersible drainage and sewage, borehole pumps — CNP, Shimge, Leo and others.
Pumping stations
Booster stations, fire pumping stations, stations with variable frequency control.
Pipes and fittings
PE100 pipes for water supply and sewerage, PPR, PVC, steel; fittings and welding equipment.
Valves
Gate valves, butterfly valves, check valves, pressure regulators, water meters.
Water treatment
Reverse osmosis units, softening, filters, UV, membrane bioreactors (MBR).
Dosing and chemicals
Dosing pumps, dosing stations, mixers, tanks.
How we check this particular product
- Duty point
- We check that the flow and head fall within the pump’s high-efficiency zone on its curve, not at the edge of the curve.
- Wetted-part materials
- We select materials for the medium: clean water, wastewater, abrasives, chemicals.
- Motor and protection
- We check the IP rating, voltage, energy efficiency class and dry-run protection.
- Testing
- We request hydraulic test reports for pumps and pressure test reports for stations.
- System compatibility
- For water treatment we match the raw water analysis with the technology and capacity of the unit.
What to send for an accurate quote
- Flow (m³/h) and head (m), or the purpose of the system
- Pumped medium and temperature
- Voltage and control method (direct-on-line, VFD)
- For water treatment — raw water analysis and required quality
- Quantity and lead times
- Delivery city
Shipping: what to keep in mind
Pumps are dense cargo
Heavy and compact: cost-effective as groupage by truck or as part of a container.
Pipes are bulky cargo
Large-diameter pipes take up volume; we calculate truck or container loading in advance.
Membranes
Membrane elements must be protected from freezing and drying out — we take this into account when choosing the route and season.
Documents and certificates
EAEU
Pumps — TR CU 010/2011 and 004/2011; equipment for drinking water supply may require sanitary approvals.
Uzbekistan
O‘zstandart certificate of conformity; for contact with drinking water — a hygiene certificate.
Technical datasheets
Performance curves, passports and manuals — we request them from the factory before shipment.
Requirements depend on the exact HS code. We check them before purchase and include the cost of certification in the quote.
Questions about this category
Can you find an equivalent for a European pump?
Yes. Send us the nameplate or model and we will select a Chinese equivalent by duty point and connection dimensions.
Can you help design a water treatment system?
Yes, our engineers design such systems. Send us the water analysis and the required capacity.
Which pipes are best for water supply?
For most applications PE100 with the right SDR for the operating pressure is suitable. We select according to the design.
How long do pumps take?
Standard models — 7–20 days of manufacturing, plus delivery.
Are spare parts for pumps available?
Yes. We offer a set of seals and impellers together with the delivery.
Send us a request and we will calculate it for your case
We reply within an hour during business hours. An offer with factory prices usually takes 3–5 business days.