Send a request

Pumps, pipes, valves and water treatment equipment

We select pumps by duty point, not by catalogue: flow, head, medium, operating mode. Our team designs water treatment systems itself, so we check the equipment as engineers.

Send a requestCalculate shipping and customs clearance

What we supply

Pumps

End-suction, multistage, submersible drainage and sewage, borehole pumps — CNP, Shimge, Leo and others.

Pumping stations

Booster stations, fire pumping stations, stations with variable frequency control.

Pipes and fittings

PE100 pipes for water supply and sewerage, PPR, PVC, steel; fittings and welding equipment.

Valves

Gate valves, butterfly valves, check valves, pressure regulators, water meters.

Water treatment

Reverse osmosis units, softening, filters, UV, membrane bioreactors (MBR).

Dosing and chemicals

Dosing pumps, dosing stations, mixers, tanks.

How we check this particular product

Duty point
We check that the flow and head fall within the pump’s high-efficiency zone on its curve, not at the edge of the curve.
Wetted-part materials
We select materials for the medium: clean water, wastewater, abrasives, chemicals.
Motor and protection
We check the IP rating, voltage, energy efficiency class and dry-run protection.
Testing
We request hydraulic test reports for pumps and pressure test reports for stations.
System compatibility
For water treatment we match the raw water analysis with the technology and capacity of the unit.

What to send for an accurate quote

  • Flow (m³/h) and head (m), or the purpose of the system
  • Pumped medium and temperature
  • Voltage and control method (direct-on-line, VFD)
  • For water treatment — raw water analysis and required quality
  • Quantity and lead times
  • Delivery city

Shipping: what to keep in mind

Pumps are dense cargo

Heavy and compact: cost-effective as groupage by truck or as part of a container.

Pipes are bulky cargo

Large-diameter pipes take up volume; we calculate truck or container loading in advance.

Membranes

Membrane elements must be protected from freezing and drying out — we take this into account when choosing the route and season.

Documents and certificates

EAEU

Pumps — TR CU 010/2011 and 004/2011; equipment for drinking water supply may require sanitary approvals.

Uzbekistan

O‘zstandart certificate of conformity; for contact with drinking water — a hygiene certificate.

Technical datasheets

Performance curves, passports and manuals — we request them from the factory before shipment.

Requirements depend on the exact HS code. We check them before purchase and include the cost of certification in the quote.

Questions about this category

Can you find an equivalent for a European pump?

Yes. Send us the nameplate or model and we will select a Chinese equivalent by duty point and connection dimensions.

Can you help design a water treatment system?

Yes, our engineers design such systems. Send us the water analysis and the required capacity.

Which pipes are best for water supply?

For most applications PE100 with the right SDR for the operating pressure is suitable. We select according to the design.

How long do pumps take?

Standard models — 7–20 days of manufacturing, plus delivery.

Are spare parts for pumps available?

Yes. We offer a set of seals and impellers together with the delivery.

Send us a request and we will calculate it for your case

We reply within an hour during business hours. An offer with factory prices usually takes 3–5 business days.

By clicking “Send” you agree to the processing of your data to answer the request. We do not share it with third parties.